This case study details the optimal construction sequencing for installing a backyard synthetic putting green during a home remodel in the Oak Hill neighborhood of Nashville, Tennessee.
Construction Sequencing & Timing
When installing artificial turf or backyard putting greens, page-3192459 recommends scheduling the installation near the very end of the construction process to protect the surface from mud, dirt, and heavy foot traffic.
- Hardscapes: All hardscaping, such as retaining walls, must be completed prior to turf installation.
- Irrigation: Avoid running irrigation lines directly underneath the synthetic grass. Positioning sprinkler heads and drip lines around the exterior perimeter allows for easier maintenance and proper spray radiuses.
- Lighting & Driveways: In the Oak Hill project, turf was installed before the driveway was completed. page-3192474 was integrated immediately after the green installation to ensure exact angling and proper illumination of both the green and the chipping tee.